Northwester 2 | Monopiles and transition pieces

Insert quote here

CLIENT ♦ Bladt Industries A/S

DURATION ♦ November 2018 – November 2019

SERVICES

  • Hydrodynamic engineering
  • Structural engineering
  • Mobilization and supervision

SCOPE

  • Transport of 24 monopiles and 24 transition pieces from Aalborg to Oostende
  • Design, fabrication, and installation of cradles and seafastening
  • Mobilization and demobilization
  • Supervision of load out/in
  • Motion analysis
Slide 1 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Slide 2 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Slide 3 Heading
Lorem ipsum dolor sit amet consectetur adipiscing elit dolor
Previous slide
Next slide
UHL_footer-pctdcan3qfrsjtvv7cv6vqu3qyowxqafdmmird19mo
UNITED ENGINEERING SOLUTIONS GmbH
Am Kaiserkai 69 | 20457 Hamburg | Germany solutions@united.engineering | +49 40 308 5424 60
Impressum | Datenschutz