REFERENCES

The following is an overview of relevant marine engineering projects successfully completed by United Engineering Solutions.

FORMOSA MONOPILE TRANSPORT

CLIENT: Jan De Nul NV

DURATION: March 2018 – May 2019

SERVICES:

  • Hydrodynamic Engineering
  • Structural Engineering
  •  Mobilisation and Supervision

SCOPE:

  • Transport of 20 monopiles from Rostock to Taichung
  • Design and fabrication of ro/ro suitable cradle
  • Design and fabrication of a tailor-made stopper console
  • Mobilisation / Demobilisation
  • Supervision of load out/in
  • Mooring and ballast calculation
  • Motion analysis and on-board monitoring of accelerations
  • Weather routing

 

TRANSPORT OF MONOPILES AND TRANSITION PIECES FOR NORTHWESTER 2

CLIENT: Bladt Industries A/S

DURATION: November 2018 – November 2019

SERVICES:

  • Hydrodynamic Engineering
  • Structural Engineering
  • Mobilisation and Supervision

SCOPE:

  • Transport of 24 monopiles and 24 Transition pieces from Aalborg to Oostende
  • Design, fabrication and installation of cradles and seafastening
  • Mobilisation / Demobilisation
  • Supervision of load out/in
  • Motion analysis

DESIGN OF A MULTIMODAL TRANSPORT FRAME FOR WINDTURBINE BLADES

CLIENT: Nordex SE

DURATION: June 2018 – December 2018

SCOPE:

  • Design of a multimodal blade frame
  • Certification
  • Production drawings

CRANE TRANSPORT AND INSTALLATION

CLIENT: Zhongxin Shipping PTE.LTD

DURATION: January 2018 – August 2018

SCOPE:

  • Transport and installation of 3 harbor cranes from Nantong to the Caribbean
  • Design, fabrication and certification of lifting frames
  • Stowage planning and seafastening
  • Supervision of loading operations

TRANSPORT OF 156 BLADES

CLIENT: Vestas Wind Systems A/S

DURATION: November 2018 – February 2019

SCOPE:

  • Transport of 156 Blades from China to Spain
  • Motion analysis
  • Stowage planning and seafstening
  • Motion analysis
  • Supervision of loading and seafastening operations
  • Motion monitoring and weather routing

TRANSPORT OF A SHIPLOADER

CLIENT: FAM Magdeburger Förderanlagen und Baumaschinen GmbH

DURATION: June 2017 – September 2017

SCOPE:

  • Transport of a Shiploader from Shanghai to Townsville
  • Stowage planning, seafastening and lifting
  • FE Analysis of hatch cover and tweendecks
  • Supervision of loading and seafastening operations